Resurs Corporation
Industrial flooring
B2B • Warehouses • Production • Parking

Industrial and polymer floors for business in Romania

10+ years without cracks or dust

Solutions for warehouses, production, parking and commercial facilities. The right coating selected for the real demands of your business

Our clients

We work with:

Warehouse complexes

Floors for storage, loading and logistics areas

Production facilities

Coatings for halls with heavy equipment

Parking facilities

Wear-resistant coatings for vehicles

Medical facilities

Hygienic and antistatic coatings

Commercial real estate

Solutions for shopping and office centers

A reliable contractor for industrial facilities
100+
projects
About the company

A reliable contractor for industrial facilities

Over 5 years in business and more than 100 projects completed across Romania. We select the right coating for the real demands of your facility and guarantee a service life of 7 to 15+ years.

Learn more about the company
Case studies

Real projects — real results

1

Logistics warehouse

Problem

The concrete floor produced dust and cracked under forklift loads. Goods were getting damaged.

Solution

Epoxy polymer coating with substrate hardening

Area
2,500 m²
Timeline
12 days
Result

Zero dust, coating service life of 10+ years. Cleaning costs reduced by 60%.

2

Production hall

Problem

Frequent floor repairs due to heavy equipment. Shutdowns of 3-4 days every quarter.

Solution

Polymer-cement industrial floor with topping

Area
1,800 m²
Timeline
10 days
Result

Not a single repair in 2 years. Savings on shutdowns and repairs of ~€15,000/year.

3

Underground parking

Problem

Slippery coating, safety complaints. Wear from winter tires.

Solution

Anti-slip polyurethane coating

Area
3,200 m²
Timeline
14 days
Result

Zero complaints for 1.5 years. The coating withstands winter loads.

4

Pharmaceutical warehouse

Problem

GMP requirements for floor antistatic properties and hygiene were not being met.

Solution

Antistatic epoxy coating with seamless technology

Area
900 m²
Timeline
7 days
Result

The facility passed the GMP audit. Electrostatic potential was brought down to compliant levels.

5

Shopping center

Problem

The old coating had cracked and needed restoration without closing the facility.

Solution

Phased restoration with a self-leveling polymer coating

Area
4,100 m²
Timeline
21 days
Result

Restoration carried out in stages, without stopping retail operations. Warranty — 7 years.

View all work

Get in touch

Every project starts with a site inspection and the selection of a solution suited to the specific demands. We don't offer one-size-fits-all solutions — we select the coating that will work specifically on your facility.